Appalachian Highway System Cost Estimate
Table B - Design Classification and Cost Estimate by Estimate Sections with Corridor Totals
State: AL ADHS Corridor: V Page: 1 of 4

Section ID A 01.0.0
LRS Milepost: Beginning/Ending 0.000 / 2.900
Status
Final Construction
1. Finance Code 20
2. Section Length (miles) 2.9
3. Class Code/Urban Code R/0
4. Location:  
---- a. FIPS State/County/Congressional 01/059/04
---- b. HPMS Signed Route/Subroute 00XP059A01/00
---- c. HPMS Signed Route/Strip Map # 0000000024/V1
5. Estimate Section/NHS Designation 1/NHS
6. Design Speed(mph) 65
7. Traffic:  
---- a. ADT/Base Year 2,340/2010
---- b. ADT/Future Year 3,300/2020
---- c. Design Year 2028
---- d. ADT-Design Year 4,990
---- e. DHV-Design Year 549
---- f. % Truck Design Year (DHV) 14
---- g. % Truck Design Year (ADT) 18
---- h. Directional Distribution Factor 60
8. Number of Lanes to be Constructed this Estimate 0
9. Ultimate Number of Through Traffic Lanes 4
10. Typical Cross Section of Reference/Access Control 1 /Partial
11. Right-of-Way Width(ft), prevailing 300
12. Median Width(ft), prevailing 54
13. Development Status (Figure 4) 3A2
Estimated Cost ($1000) per Work Classification   

14. Preliminary Engineering:  
---- a. Location 0
---- b. Design 0
15. Right-of-Way:  
---- a. Acquisition 0
---- b. Relocation 0
16. Utility Adjustments 0

17. Erosion Control/Clear/Grade/Drain/Minor Structure 0
18. Subbase, Base, Surfacing, Shoulders 0
19. Railroad Grade Separations 0
20. Highway Grade Separations without Ramps 0
21. Interchanges 0
22. Other Bridges, Tunnels, and Walls 0
23. Traffic Control 0
24. Environmental Mitigation 0
25. Roadside Improvements:  
---- a. Landscape Planting 0
---- b. Rest Area, Overlooks 0
26. All Other Items 0

27. Subtotal (Lines 17 to 26) 0
28. Construction Engineering (% of Line 27) 0
29. Total Cost of Construction (Line 27 & Line 28) 0
30. Total Estimated Cost (Line 14, 15, 16, 29 & 5% Contingency) 0


A 01.1.0
2.900 / 5.100
Final Construction
20
2.2
R/0
 
01/059/04
00XS059024/00
0000000024/V1
1/NHS
65
 
6,160/2010
8,690/2020
2028
12,830
1,411
9
12
60
0
4
2 /Partial
300
54
3A2
   

 
0
0
 
0
0
0

0
0
0
0
0
0
0
0
 
0
0
0

0
0
0
0


A 02.0.0
5.100 / 13.600
Final Construction
20
8.5
R/0
 
01/059/04
00XS059024/00
0000000024/V1
1/NHS
65
 
3,440/2010
4,850/2020
2031
6,620
728
12
16
60
0
4
2 /Partial
300
54
3A2
   

 
0
0
 
0
0
0

0
0
0
0
0
0
0
0
 
0
0
0

0
0
0
0


A 03.0.0
13.600 / 21.400
Stage Construction
21
7.8
R/0
 
01/059/04
00XS059024/00
0000000024/V2
1/NHS
65
 
4,180/2010
5,890/2020
2031
8,040
804
11
15
60
2
4
2 /Partial
300
54
3A3C
   

 
0
0
 
0
0
0

505
12,533
0
0
0
0
0
0
 
0
0
0

13,038
1,695
14,733
15,470


A 07.1.0
13.990 / 14.800
Stage Construction
21
0.8
R/0
 
01/079/05
00XS079024/00
0000000024/V5
1/NHS
65
 
10,500/2010
14,810/2020
2021
15,300
1,680
8
10
60
0
4
1 /Full
300
54
3A3A
   

 
0
1,228
 
0
0
0

0
0
0
0
10,867
0
0
0
 
0
0
0

10,867
1,413
12,280
14,183


A 11.0.0
33.820 / 35.030
Final Construction
20
1.2
U/295
 
01/103/05
00XS103067/00
0000000067/V7
1/NHS
65
 
22,550/2010
31,800/2020
2024
46,310
5,090
8
10
65
0
6
3 /Partial
300
30
3A2
   

 
0
0
 
0
0
0

0
0
0
0
0
0
0
0
 
0
0
0

0
0
0
0