ADHS Information Management System
Register
Log in
Return to Portal
State:
select
AL
GA
KY
MD
MS
NC
NY
OH
PA
SC
TN
VA
WV
Corridor:
select
V
X
X1
Section:
select
A 01.0.0
A 01.1.0
A 02.0.0
A 03.0.0
A 04.0.0
A 04.1.0
A 05.0.0
A 05.1.0
A 05.2.0
A 06.0.0
A 06.1.0
A 07.0.0
A 07.1.0
A 07.2.0
A 08.0.0
A 09.0.0
A 10.0.0
A 10.1.0
A 11.0.0
A 11.2.0
A 11.3.0
A 13.1.0
A 13.2.0
A 13.3.0
A 14.0.0
B 07.2.0
B 07.2.1
B 07.2.2
B 07.3.0
B 08.0.0
B 09.0.0
B 10.0.0
B 11.0.0
B 11.1.0
B 12.0.0
B 12.1.0
B 13.0.0
B 13.0.1
B 13.1.0
B 14.0.0
B 14.1.0
B 15.0.0
B 15.1.0
B 15.2.0
B 15.3.0
B 15.4.0
B 15.5.0
B 15.6.0
B 16.0.0
B 16.1.0
B 17.0.0
B 18.0.0
B 18.1.0
B 19.0.0
Development Status
GIS
Development Status
Future Outlook
Table
Reports
State Development Status Summary
Corridor Development Status Summary
State Future Outlook Summary
Local Access Roads Status
Access Files via FTP
Cost Estimate
GIS
Table
Reports
Segment Descriptions
Corridor and State Totals
Prefinanced, Bond Issue, and Advanced Right-of-Way Projects
Federal Funding Earmarks
Utility Reports
Completion Plan
GIS
Table
Reports
Document Manager
Contact Us
1
2
Print
Standard (8.5x11 inches)
Large (11x17 inches)
Appalachian Highway System Cost Estimate
Table C - Cost Estimates By Corridors and State Total
Includes all eligible costs and associated mileages reported in Table B for Finance Codes 21, 22, and 23)
State: AL
Page: 1 of 2
ADHS Corridor
Class: Rural or Urban
Length in Miles
Total Mileage (Rural + Urban)
14. Preliminary Engineering:
---- a. Location
---- b. Design
15. Right-of-Way:
---- a. Acquisition
---- b. Relocation
16. Utility Adjustments
17. Erosion Control/Clear/Grade/Drain/Minor Structure
18. Subbase, Base, Surfacing, Shoulders
19. Railroad Grade Separations
20. Highway Grade Separations without Ramps
21. Interchanges
22. Other Bridges, Tunnels, and Walls
23. Traffic Control
24. Environmental Mitigation
25. Roadside Improvements:
---- a. Landscape Planting
---- b. Rest Area, Overlooks
26. All Other Items
27. Subtotal (Lines 17 to 26)
28. Construction Engineering (% of Line 27)
29. Total Cost of Construction (Line 27 & Line 28)
30. Total Estimated Cost (Line 14, 15, 16, 29 & 5% Contingency)
31. Total Cost (Rural + Urban)
V
Rural
21.7
26.9
0
2,256
725
186
0
12,823
27,162
0
0
10,867
0
84
0
0
0
0
50,936
6,621
57,557
63,761
156,217
Urban
5.2
0
196
12,012
853
4,716
27,434
22,400
0
0
0
11,558
800
0
0
0
0
62,192
8,085
70,277
92,456
X
Rural
24.6
36.6
0
425
585
0
513
1,117
23,507
0
0
0
0
3,040
0
0
8,774
1,043
37,481
4,873
42,354
46,070
132,057
Urban
12.0
0
682
0
0
2,340
2,499
56,439
0
0
0
4,819
6,040
0
0
0
0
69,797
9,074
78,871
85,987
X1
Rural
18.1
65.0
0
28,977
72,775
0
11,367
82,523
111,789
5,150
9,401
117,266
94,311
13,599
0
0
0
0
434,039
56,425
490,464
633,762
2,966,414
Urban
46.9
0
158,649
359,617
0
34,810
251,331
290,382
47,040
138,536
522,015
179,734
47,509
0
0
0
0
1,476,547
191,951
1,668,498
2,332,652